CONSTRUCTION ACCIDENTS | 2026-01-03
Fremont Construction Accident Liability for Hazards an Earlier Trade Left Behind and for Defects in Finished Work: Uncovered Openings, Live Wiring, Loose Railings and the Repose Rules
When the company that created the danger had already moved on, and when a defect shows up after the building opens
By Anatolii Trembach, Esq. (California State Bar No. 349304; LL.M., USC Gould School of Law; admitted to the U.S. Court of International Trade), Trembach Law Firm, APC · Published · Updated
Construction is a relay. Excavators hand the site to the foundation crew, framers hand it to plumbers and electricians, and finish trades follow them. Each handoff is a chance for a hazard to be left behind: a floor opening a plumber cut and never covered, a circuit an electrician left energized...
Contact Trembach Law Firm at (818) 514-7680 for a confidential consultation.
Trembach Law Firm | 27001 Agoura Road, Suite 350, Calabasas, CA 91301